Tag Archives: Micro Engineerring track

Track and the Holidays

Busy working on getting some new track in place before my grandsons Cooper and Fletcher arrive.
A combination of Central Valley and Micro Engineering track and switches, with help from the afore mentioned Ribbonrail track gauges.
I hope everyone has a great holiday season, and I’ll see you next year

The Perils of Humidity

Jumping ahead a little just to relate an “oh no” realization about barge cement and the perils of east coast, Mid Atlantic basements and the changes in humidity and temperature. I laid a fair amount of Central Valley tie strips and Micro Engineering code 70 rail applied with barge cement. As you can see in the photo, the seasonal pressure to expand was too much for the barge to contain. To be fair, Central Valley’s new tie strips are molded with push over mechanical spikes and rail clamps, and this works very well. Sometimes the learning process does seem frustrating, but its all worth it. I have decided to use the NEW central Valley strips and also Micro Engineering code 70 flex track in hidden areas (tunnels,covered connectors, staging). I think it’s all an adventure worth taking.

Track problems

Track out of gauge