Continuing work on the Lumbering branch line

I have been concentrating on working on the branch line this week, so here are some photos of progress at the future site of the sawmill.

Getting the sidings in place for the log slide to the pond and a siding for finished product.

Next a series of Photographs showing creating the terrain around where the mill will be.

Adding slab of foam for base of mill area.

Adding slope down base.

Using some hydrocal rocks from rock molds and plaster cloth.

Then filling with more rocks and blending with sculptamold

Next will be determining the contours of the mill area (buildings, pond etc.