More on new buildings

This time partially completed Lumber Mill, kit bashing an old Suydam kit with changed windows, doors, reconstructed missing parts and eventually scratch built additions.

First side, adding new windows and doors from Tichy Train Group, with weathered and rusting corrugated siding

Assembling the structure on a steel machinists plate. Handy to hold things in position with magnets, since the walls are steel.

Assembling with Epoxy and CA Glue

Next brick portion

Brick incinerator building

Adding Weathering to Doors etc.

Freight Door

Then starting to plan positioning on the layout on the Lumber branch.

Mill Side

Whole area plan showing places for Log chute, pond area, log dump, stream and separate scratch built finishing building and loading dock

Partially completed Mill on Plan of area