Passenger station area pt2

Continuing to work on my multi level passenger station first posted in December

pouring curb and steps to the station from the parking area

Looking along the future parking area toward the base for the station being glued in place. and yes, the hold down weights are defunct internal hard drives.

Road and parking area, with train shed structures
below

Start of sidewalks etc around the station building

Station area with sidewalks and railings

Getting a feeling for half of the station building in place. The other part will be to the left and scratch built, essentially as if the station were enlarged at a later date than this part.

first part of station building in rough position with railings, sidewalks, and steps.

Much detail, weathering, windows, painting, people etc to be added, in future posts.