This time partially completed Lumber Mill, kit bashing an old Suydam kit with changed windows, doors, reconstructed missing parts and eventually scratch built additions.
Assembling the structure on a steel machinists plate. Handy to hold things in position with magnets, since the walls are steel.
Next brick portion
Adding Weathering to Doors etc.
Then starting to plan positioning on the layout on the Lumber branch.
Whole area plan showing places for Log chute, pond area, log dump, stream and separate scratch built finishing building and loading dock